For logistics, manufacturing and large warehousing enterprises operating in Addis Ababa, stable and cost-effective material handling equipment is the core support to maintain smooth daily operation. For facilities that adopt three-shift working mode to maximize site utilization and output efficiency, the comprehensive running cost of stacking equipment directly affects the overall annual operating profit of the enterprise.
As a professional service provider focusing on BYD electric forklifts, Jianshu New Energy has accumulated a large amount of actual operation data of BYD electric stackers serving local enterprises in Addis Ababa in recent years, and can provide objective, practical reference for enterprises that plan to adjust their material handling equipment deployment.

From the perspective of energy consumption cost, BYD electric stackers complete energy supplement through local grid charging. Under the actual 24-hour three-shift continuous operation scenario in Addis Ababa, the daily power consumption of the equipment is consistent with the official rated operation parameters. Combined with the stable local industrial electricity price level, the daily energy cost of a single unit is significantly lower than the daily energy cost of traditional same-specification handling equipment that runs for the same duration.
.jpg)
From the perspective of daily maintenance cost, in the three-shift long-time continuous operation scenario, BYD electric stackers do not have internal combustion related parts that need frequent regular replacement or complex maintenance. The regular maintenance items are mainly focused on brake system inspection, tire wear check and power system status detection, the annual maintenance cost of the equipment is kept at a relatively stable low level, and there is no sudden high maintenance cost caused by internal combustion component failure during non-stop operation.
From the perspective of continuous operation guarantee cost, local enterprises in Addis Ababa that have deployed BYD electric stackers for three-shift operation in the past two years have reported that the equipment maintains stable operation performance in long-time continuous working scenarios. Our local service team can respond to equipment demand in time, which can effectively avoid long equipment downtime that interferes with the pre-arranged three-shift operation schedule.
Enterprises that want to get more detailed customized operation cost data can send consultation emails to [email protected], our professional technical team will provide targeted cost analysis combined with the actual operation scenario of the enterprise.
