When manufacturing enterprises start the construction of new production sites, most of them used to finish the main plant construction first and then select corresponding material handling equipment, which often leads to mismatched site parameters, extra transformation cost and reduced operation efficiency. Building the whole manufacturing plant plan around electric forklift in the initial design stage can effectively avoid such problems, and help enterprises build a smoother, low-carbon and high-efficiency internal logistics system from the very beginning.
The first core part of the planning is site layout matching. Before confirming the final architectural drawing, enterprises need to combine the basic operation parameters of selected electric forklifts, to set reasonable passage width that meets the minimum turning radius of equipment, adjust the height of loading and unloading platforms to fit the forklift load and fork lifting range, and reserve enough safety clearance between shelves and operation passages to avoid collision risks. The dedicated charging area should be set at the middle position connecting the production workshop and the raw material and finished product warehouse, far away from crowded personnel passages and fire exits, with reserved waterproof, ventilation and heat dissipation conditions to meet long-term stable charging demands.
.jpg)
The second core part is energy consumption supporting planning. According to the total number of electric forklifts that will be put into operation in the whole plant, calculate the total peak power demand of charging, reserve corresponding power distribution capacity in the early stage of plant construction, to avoid extra cost and construction period loss caused by temporary power capacity expansion after the plant is put into use. Enterprises can also reserve installation space for photovoltaic power generation and energy storage systems, to make full use of clean energy to reduce the operation cost of electric forklifts in the long run.
The third core part is the operation and maintenance supporting space reservation. It is recommended to set up a special daily inspection area for electric forklifts near the charging zone, configure basic maintenance tools and spare parts storage space, and set up a fixed training area for forklift operators to carry out regular safety operation and daily maintenance training, to prolong the service life of equipment and reduce potential safety risks.
.jpg)
As a professional service provider focused on BYD electric forklifts, Jianxin New Energy can provide full-process professional consultation service for manufacturing enterprises that need to build plant plans around electric forklifts. If you have relevant demands, please send emails to [email protected] for more customized solutions.