When you are about to introduce a BYD electric forklift to your daily logistics operation, sufficient and systematic pre-preparation work can effectively avoid unnecessary operation risks, extend the service life of the equipment, and maximize its working performance to match your actual scenario demands.
1. Work Site Adaptation Preparation
Before the equipment arrives, you need to first inspect the operation site to meet the basic operation requirements of the electric forklift. Check the passage width to ensure there is enough space for the forklift to turn and pass safely, remove all sundries scattered on the operation route that may cause obstacles or scratches, and confirm the ground bearing capacity meets the load requirements of the forklift with full load of goods. If there is slope section in the operation area, verify that the slope gradient is within the applicable range of the equipment. You also need to arrange a dedicated, dry and ventilated storage and charging area for the forklift, keep the area away from direct sunlight, rain splash and flammable and explosive materials, and reserve enough space for charging cable arrangement and personnel operation.
2. Pre-arrival Equipment Check
After the equipment is delivered to your site, first check the outer packaging for no obvious damage, then unpack to confirm that the main body of the forklift, matching spare parts and supporting documents are all intact and consistent with the order content. Do not start the equipment in a hurry at the first step, you should check the external connecting parts to confirm there is no loose parts caused by bump in transportation, check the connection status of the power battery interface, make sure the interface is clean and there is no foreign matter residue. You can also check the tire pressure status to confirm it meets the factory specified standard.
3. Relevant Personnel Operation Training
Arrange all operators who will use this electric forklift to participate in the systematic operation training, including the basic operation process, common fault judgment, emergency response plan, correct charging operation specifications and daily simple maintenance points of the equipment. Make sure all operators have fully mastered the operation logic of the electric forklift, and do not allow untrained personnel to drive the equipment privately.
.jpg)
4. Low-load Trial Operation Arrangement
Before putting the equipment into formal full-load operation, arrange 2 to 3 hours of low-load trial run, test the steering, lifting, braking, walking and other core functions of the equipment one by one, confirm there is no abnormal noise or abnormal response during the operation process. Record any abnormal situation you found during the trial run, and contact the professional technical personnel for adjustment in time.
As a professional service provider focused on BYD electric forklift, Jianshu New Energy provides full range of pre-preparation guidance and supporting services for customers. If you have any questions about the preparation work for BYD electric forklift, you can send email to [email protected] for further consultation.